Epoxying - laminating hstab and elev spars

Image
 3x tail spars laminated up, buzzed and thicknessed.         Time Spent: 10 hrs Previous Total Time: 512 hrs New Total Time: 522 hrs

Epoxying - underside fuselage crossmembers 5 - 6

Image
 The last of the fundamental fuselage framing is in.  Time to extract it from the bench/jigs. Time Spent: 2 hrs Previous Total Time: 510 hrs New Total Time: 512 hrs

Epoxying - underside fuselage crossmembers 2 - 4

Image
 Basic fuselage framing nearly complete.  One more glue-up and it can be removed from the bench. Time Spent: 4 hrs Previous Total Time: 506 hrs New Total Time: 510 hrs

Epoxying - hstab bulkhead framing and sternpost

Image
Some more horizontal bits to put in then it's off the bench.  Time Spent: 2 hrs Previous Total Time: 504 hrs New Total Time: 506 hrs

Epoxying - port uprights aft 6-9

Image
More uprights glued in.  The fuse is trapezoidal in cross section so it takes a bit to get the sides aligned symmetrically.  Next step is the horizontal stab bulkhead and stern post that are already dry fitted. Time Spent: 4 hrs Previous Total Time: 500 hrs New Total Time: 504 hrs

Epoxying - starboard uprights aft 6-9

Image
 More parts aligned and glued in. Bonus snoozy workshop cat: Time Spent: 4 hrs Previous Total Time: 496 hrs New Total Time: 500 hrs

More fuselage parts

Image
 Starboard vertical fuse members all dry fitted. Time Spent: 2 hrs Previous Total Time: 494 hrs New Total Time: 496 hrs

Fitting the stern post

Image
Stern post made and fitted.   Lots of checking to get the geometry all correct. Time Spent: 4 hrs Previous Total Time: 490 hrs New Total Time: 494 hrs

Epoxying - front lower fuse longerons / crossmembers 1, 2

Image
 The front of the fuselage is all framed up now.  Time to stitch together everything aft of the seat back. Time Spent: 3 hrs Previous Total Time: 487 hrs New Total Time: 490 hrs

Epoxying - 1S, 2S, 5S lower uprights

Image
More bits and pieces.   Time Spent: 3 hrs Previous Total Time: 484 hrs New Total Time: 487 hrs