Big metalwork order
I spent a lot of time going through the plans and ordering as much of the metal as I could at this stage. Lots of tube, hinges and other various bits and pieces should be heading my way shortly. A bit of substitution was required because 1964 British sizes and materials vary from what's available now from the US. Was pretty educational.
Time Spent: 3 hrs
Previous Total Time: 116 hrs
New Total Time: 119 hrs

Comments
Post a Comment